K11 Universal waterproof coating

I.Core Functions
-
Penetration Crystallization Waterproofing: The active ingredients in the slurry can penetrate into the capillary pores and micro-cracks of the cement base to conduct chemical reaction, generating insoluble dendritic crystals to block water seepage channels from the inside, forming a dense integrated waterproof layer. It also has waterproof function on the negative water surface.
-
Available for Construction on Wet Base: It can be directly constructed on wet base without waiting for the base to be completely dry, effectively shortening the construction period.
-
Convenient Follow-up Processes: There is no need to build an additional mortar protection layer after construction. Follow-up operations such as tile pasting, plastering and finish construction can be carried out directly, greatly improving construction efficiency.
-
Environmental Protection & Safety: It is a water-based product, non-toxic, harmless and pollution-free, which is a green environmental protection material. It can be directly used in scenarios directly contacting with water such as drinking water tanks and fish ponds. Meanwhile, it can inhibit the growth of mold and prevent the pollution of moisture and salt to the finish.

-
Impermeability, Crack Resistance & Compression Resistance: The crystals penetrate into the base material, endowing the waterproof layer with high impermeability and compression resistance. It can cover micro-cracks less than 0.4mm and resist slight structural vibration.

II.Application Scenarios

III.Technical Parameters
| Execution Standard | GB/T 23445-2009 |
| Appearance | The liquid component is milky white emulsion, the powder component is gray/green/blue powder, and the mixture is uniform paste. |
| Solid Content | ≥85% |
| Surface Drying Time | ≤4h |
| Tensile Strength (untreated) | ≥1.2MPa |
| Elongation at Break | ≥80% |
| Bonding Strength | ≥2.0MPa |
| Water Impermeability | 0.3MPa, no leakage for 30min |
| Alkali Resistance | No abnormality after 96h test |
| Reference Consumption |
For waterproof construction (2 coats, total thickness 1.2mm): approx. 1.2-1.5kg/㎡; For moisture proofing construction (thickness 0.6mm): approx. 0.6kg/㎡ |
| Applicable Construction Temperature |
5℃-40℃ |
Ⅳ.Construction Method
-
Base Treatment: The base surface shall be firm, flat, clean, free of looseness, sanding, oil stains and open water. Obvious pores and sand holes shall be blocked and smoothed with cement mortar, and sharp edges, internal and external corners shall be treated as rounded corners. If the base is dry, sprinkle water to wet it in advance until there is no open water.
-
Material Mixing: According to the ratio of liquid component : powder component = 1:1.25, pour the liquid component into the mixing container first, then slowly add the powder component, stir fully with an electric mixer for 3-5 minutes until uniform paste without particles and sediment is formed. Intermittent stirring can be carried out during the operation to prevent slurry sedimentation.
-
Node Reinforcement: For special node parts such as internal and external corners, pipe roots, construction joints and junctions of different materials, carry out additional layer reinforcement treatment first, apply the slurry thickly on the node parts with a brush for sealing and leakage stopping.
-
Layered Coating: Brush the slurry evenly with a brush or roller, do not miss any area. Generally, 2 coats are required, and the thickness of each coat shall not exceed 1mm. The coating directions of the two coats shall be vertical and cross. The interval time shall be subject to the coating drying and non-sticky to hands, usually 1-2 hours. If the interval exceeds 24 hours and the coating is cured, wet the base fully with clean water first before the next coat.
-
Curing & Acceptance: After the construction is completed, avoid disturbing the coating before it dries. After curing for 24 hours at normal temperature, the water closed test can be carried out to accept the waterproof effect.

V.Packaging & Storage
-
Packaging Specification: Three specifications are available: 5kg/barrel, 10kg/barrel and 20kg/barrel, with matched two-component packaging.
-
Storage Conditions: The liquid component shall be stored in a cool and dry place above 5℃, avoid sunlight and freezing. The powder component shall be stored in a dry and ventilated place to prevent moisture.
-
Shelf Life: For unopened products, the shelf life is 12 months under the above compliant storage conditions.

Company overview
Overview: Founded 2017-11-28; registered capital RMB 5M. Annual turnover RMB 10-50M. Sales network: 500+ dealers; domestic and export markets.

Core Products & Applications:Various types of waterproof coatings for roads and bridges, and waterproof coatings for home decoration: interface agents, heat insulation coatings, wall and floor primers, anti-rust primers, K11, JS, latex paints, polyurethane etc.Used for bridges, subway tunnels, roofs, basements, water tanks, sewage plants, residential kitchens/bathrooms.

Advantages:
Tech & Certification: 12 core patents; provincial Sci-Tech Progress Award; certified by National Building Materials Testing Center and CRCC; core products operable to -25°C.
Capacity & Supply: 6 automated lines; annual capacity 120,000 t (+50,000 t high-performance); 30 provincial logistics nodes; 48-hour emergency supply; 99.2% on-time delivery.
Quality & Service: Six-stage QC; <0.3% repair rate (3 yrs); 10-year warranty; 20-person technical team; 85% repurchase rate.
Channel Support: Regional distributor protection; export capability; franchise support (store subsidies, materials, training, marketing, rebates).


Customization & MOQ: Minimum 1 ton; adjustable performance (weather/low-temp resistance, tensile, solid content); packaging 5/20/25/50 kg or custom; tailored formulas for bridges, roofs, basements, tunnels, residential.
Process: 1.request 2.R&D 3.sample 4.production 5.QC 6. delivery.

Factory & Process: Standardized automated manufacture; R&D lab and QC center;
1.raw material inspection
2.precise batching
3.polymer modification/emulsification
4.filtration/homogenization
5.batch testing 6.automated filling/labeling
7.warehousing & distribution.
Environmental controls meet national standards.

Logistics & Packaging: Standard packs 5/20/25/50 kg; custom branding; nationwide FTL/LTL/express (3-5 working days; 48-hour emergency); export packaging, customs, sea/air freight; leak-proof/moisture-proof packing, tracking damage replacement.